System Conflict Resolution

Project Management and Construction Administration – System Conflict Resolution

System Conflict Resolution

ARCHITECTURAL ENGINEERING PE EXAM SPECIFICATIONS

System Conflict Resolution In Engineering Project Management

In the dynamic world of engineering project management, conflicts are inevitable. From resource allocation to differing stakeholder expectations, conflicts can arise at any stage of a project. Resolving these conflicts efficiently and effectively is crucial to maintaining project timelines, budgets, and team morale.

Common Sources of Conflict in Engineering Project Management

1. Resource Allocation

Conflicts over resources, such as manpower, equipment, and budget, are prevalent in engineering projects. When multiple projects compete for the same resources, prioritization becomes challenging, leading to disagreements among project managers and teams.

2. Differing Stakeholder Expectations

Engineering projects often have multiple stakeholders, including clients, investors, regulatory bodies, and end-users. Each stakeholder group may have distinct priorities and expectations, which can conflict with one another.

3. Technical Disputes

Engineers often face technical disagreements regarding the best approach to design, development, or problem-solving. Such disputes can arise from different interpretations of data, preferences for specific technologies, or varying levels of experience and expertise.

4. Communication Breakdown

Ineffective communication is a significant source of conflict. Misunderstandings, lack of clear instructions, and inadequate information sharing can lead to errors and disputes.

5. Schedule Delays

Delays in project schedules can create tension among team members, clients, and other stakeholders. The pressure to meet deadlines can exacerbate existing conflicts and lead to new ones.


Real-World Examples of Conflict in Engineering Projects

Example 1: The Denver International Airport Baggage Handling System

The Denver International Airport faced significant delays and cost overruns due to a failed automated baggage handling system. The conflict arose from differing expectations between the airport management and the contractors regarding the system’s complexity and the timeline for its completion. Inadequate communication and underestimation of technical challenges led to misaligned goals and eventual system failure.

Example 2: Boston’s Big Dig

The Big Dig, a massive highway project in Boston, encountered numerous conflicts over design changes, cost escalations, and environmental concerns. Stakeholders, including government agencies, contractors, and the public, had conflicting interests, which led to delays and budget overruns. Technical disputes over tunnel safety and structural integrity also added to the conflicts.

Solutions for Conflict Resolution in Engineering Project Management

1. Clear Communication Channels

Establishing clear and open communication channels is fundamental to preventing and resolving conflicts. Regular meetings, detailed documentation, and the use of project management tools can ensure that all stakeholders are on the same page.

Solution Example: Implementing a project management software that includes messaging, task assignments, and document sharing can streamline communication and reduce misunderstandings.

2. Stakeholder Alignment Meetings

Organize stakeholder alignment meetings at the project’s outset and at key milestones. These meetings should aim to clarify expectations, define roles and responsibilities, and set common goals.

Solution Example: In the case of the Denver Airport, early alignment meetings with all involved parties could have identified potential challenges and set realistic timelines, avoiding later conflicts.

3. Resource Management Strategies

Develop a comprehensive resource management plan that prioritizes resource allocation based on project needs and deadlines. Use resource leveling and resource smoothing techniques to manage conflicts over shared resources.

Solution Example: For large-scale projects like the Big Dig, using resource management software to monitor and adjust resource allocation in real-time could have mitigated conflicts related to resource shortages.

4. Conflict Resolution Training

Equip project managers and team leaders with conflict resolution training. Skills such as active listening, negotiation, and mediation can help de-escalate tensions and find mutually acceptable solutions.

Solution Example: Regular workshops on conflict resolution techniques can prepare project managers to handle disputes effectively, maintaining project continuity and team cohesion.

5. Integrated Project Delivery (IPD)

Adopt Integrated Project Delivery (IPD) methods that promote collaboration among all stakeholders from the project’s inception. IPD encourages shared risks and rewards, fostering a team-oriented approach to conflict resolution.

Solution Example: Implementing IPD in the Big Dig project could have aligned the interests of different stakeholders, reducing conflicts over budget and design changes.

6. Third-Party Mediation

When internal resolution efforts fail, involving a neutral third party can help mediate the conflict. Professional mediators can provide unbiased perspectives and facilitate constructive dialogue.

Solution Example: In projects with high stakes, such as large infrastructure developments, third-party mediation can help resolve disputes over contract terms or project scope changes.


Conflict is an inherent part of engineering project management. However, with proactive strategies and effective communication, conflicts can be resolved efficiently, ensuring project success. By understanding the common sources of conflict and implementing the solutions discussed, engineering project managers can minimize disruptions, foster a collaborative environment, and achieve project objectives on time and within budget.

Professional engineers must recognize that conflict resolution is not just about addressing disputes but also about preventing them through meticulous planning and stakeholder engagement. Adopting best practices in communication, resource management, and conflict resolution training can transform potential conflicts into opportunities for growth and innovation in engineering projects.

Let us know if there is anything we can do to help you prepare for the exam.


System Conflict Resolution

Architectural Engineering PE Exam Resources
NCEES
Contact Us

Copyright©  All Rights Reserved

EngineeringDesignResources.com prohibits the use or reproduction of this material by any means, graphic, electronic, or mechanical, except in the case of brief quotations embodied in critical articles and reviews. This includes photocopying, recording, taping, or by any information storage retrieval system.

Due to the dynamic nature of the Internet, web addresses or links in these materials may have changed.

Any resemblance in the images in this material to actual people or locations is merely coincidental. EngineeringDesignResources.com prohibits reprinting, copying, changing, reproducing, publishing, uploading, posting, transmitting, or using in any other manner images in this material.

Scheduling of Design Tasks, Sequence of Activities – CPM

Project Management and Construction Administration – Scheduling of Design Tasks, Sequence of Activities – CPM

Scheduling of Design Tasks

ARCHITECTURAL ENGINEERING PE EXAM SPECIFICATIONS

Scheduling of Design Tasks and the Critical Path Method in Engineering Project Management

Effective project management is crucial in engineering to ensure that projects are completed on time, within budget, and to the required quality standards. One of the key components of successful project management is the scheduling of design tasks and the sequencing of activities. Among the various techniques available, the Critical Path Method (CPM) stands out as a powerful tool for managing complex projects.

Scheduling of Design Tasks

Importance of Scheduling in Engineering Projects

Scheduling is the process of organizing, planning, and outlining the timelines of various tasks in a project. For engineering projects, particularly those involving design work, scheduling ensures that all tasks are completed in a logical order, resources are optimally utilized, and potential bottlenecks are identified early.

Steps in Scheduling Design Tasks

  1. Define Project Scope and Objectives: Clearly outline the project’s goals and deliverables. This step sets the foundation for identifying all the tasks needed to achieve the project’s objectives.
  2. Break Down the Project into Tasks: Decompose the project into smaller, manageable tasks or work packages. Each task should have a clear purpose and outcome.
  3. Determine Task Dependencies: Identify which tasks depend on the completion of others. Understanding these dependencies is crucial for effective sequencing.
  4. Estimate Task Durations: Assign a realistic time frame to each task based on past experience, industry standards, or expert judgment.
  5. Allocate Resources: Determine the resources required for each task, including personnel, equipment, and materials.
  6. Create the Project Schedule: Use scheduling tools such as Gantt charts or project management software to visualize the sequence and timing of tasks.

Example: Scheduling Design Tasks for a Bridge Construction Project

In a bridge construction project, the design phase might include tasks such as site analysis, preliminary design, detailed design, and design review. Here is how you might schedule these tasks:

  • Site Analysis: 2 weeks
  • Preliminary Design: 4 weeks
  • Detailed Design: 8 weeks (starts after the preliminary design)
  • Design Review: 2 weeks (starts after the detailed design)

By visualizing these tasks on a Gantt chart, you can see the sequential flow and overlap where possible to optimize the timeline.


Sequence of Activities

Understanding Task Sequencing

The sequence of activities in a project defines the order in which tasks are performed. Proper sequencing ensures that the project flows logically from start to finish, avoiding delays caused by tasks being started prematurely or out of order.

Types of Task Dependencies

  1. Finish-to-Start (FS): A task must finish before the next one can start.
  2. Start-to-Start (SS): Two tasks can start simultaneously.
  3. Finish-to-Finish (FF): Two tasks must finish at the same time.
  4. Start-to-Finish (SF): A task must start before another can finish.

Example: Sequencing Activities for a Residential Building Design

Consider a residential building design project with the following tasks:

  • Foundation Design (FS)
  • Structural Design (FS)
  • Electrical Design (SS with Structural Design)
  • Plumbing Design (SS with Structural Design)
  • Final Design Review (FF with Electrical and Plumbing Design)

By identifying these dependencies, you can create a sequence that minimizes idle time and resource conflicts.


Critical Path Method (CPM)

What is CPM?

The Critical Path Method is a step-by-step project management technique used to identify the longest sequence of dependent tasks (the critical path) and determine the shortest possible project duration. CPM helps in pinpointing tasks that cannot be delayed without affecting the overall project timeline.

Steps in Applying CPM

  1. List all Activities: Enumerate all the tasks required to complete the project.
  2. Establish Dependencies: Determine the relationships between tasks.
  3. Draw the Network Diagram: Create a visual representation showing tasks and dependencies.
  4. Estimate Duration for Each Task: Assign estimated times to each task.
  5. Identify the Critical Path: Calculate the earliest and latest start and finish times for each task to find the longest path.
  6. Update the CPM Diagram: Regularly update the diagram to reflect progress and changes.

Example: CPM for an Industrial Plant Design Project

In an industrial plant design project, tasks might include site preparation, equipment layout design, utility systems design, and safety compliance checks. Here’s a simplified example:

  • Site Preparation: 3 weeks
  • Equipment Layout Design: 6 weeks (starts after site preparation)
  • Utility Systems Design: 4 weeks (starts after equipment layout design)
  • Safety Compliance Checks: 2 weeks (starts after utility systems design)

Critical Path Calculation:

  1. List the tasks and their durations.
  2. Draw the network diagram:
    • Site Preparation → Equipment Layout Design → Utility Systems Design → Safety Compliance Checks.
  3. Calculate the earliest start and finish times:
    • Site Preparation: 0-3 weeks
    • Equipment Layout Design: 3-9 weeks
    • Utility Systems Design: 9-13 weeks
    • Safety Compliance Checks: 13-15 weeks
  4. Identify the critical path: Site Preparation → Equipment Layout Design → Utility Systems Design → Safety Compliance Checks (15 weeks total).

Any delay in these tasks would directly extend the project’s duration.

Benefits of CPM

  • Identifies Critical and Non-Critical Tasks: CPM highlights tasks that can be delayed without affecting the project’s end date.
  • Optimizes Resource Allocation: By focusing on the critical path, resources can be allocated efficiently to ensure that critical tasks are completed on time.
  • Improves Time Management: Project managers can use CPM to develop realistic schedules and timelines.

Scheduling design tasks, sequencing activities, and employing the Critical Path Method are essential components of effective project management in engineering. These techniques ensure that projects are well-organized, resources are efficiently utilized, and deadlines are met. By understanding and applying these methods, professional engineers can enhance their project management capabilities, leading to successful project outcomes.

In practice, the combination of these tools provides a robust framework for managing complex engineering projects. Whether you are designing a bridge, a residential building, or an industrial plant, the principles of task scheduling, activity sequencing, and CPM will help you navigate the intricacies of project management, ensuring that you deliver high-quality results within the constraints of time and budget.

Let us know if there is anything we can do to help you prepare for the exam.


Scheduling of Design Tasks, Sequence of Activities – CPM

Architectural Engineering PE Exam Resources
NCEES
Contact Us

Copyright©  All Rights Reserved

EngineeringDesignResources.com prohibits the use or reproduction of this material by any means, graphic, electronic, or mechanical, except in the case of brief quotations embodied in critical articles and reviews. This includes photocopying, recording, taping, or by any information storage retrieval system.

Due to the dynamic nature of the Internet, web addresses or links in these materials may have changed.

Any resemblance in the images in this material to actual people or locations is merely coincidental. EngineeringDesignResources.com prohibits reprinting, copying, changing, reproducing, publishing, uploading, posting, transmitting, or using in any other manner images in this material.

Quality Control

Project Management and Construction Administration – Quality Control

Quality Control

ARCHITECTURAL ENGINEERING PE EXAM SPECIFICATIONS

Quality Control

Quality Control (QC) is paramount in the world of engineering project management. QC involves the systematic processes employed to ensure that a project meets the defined standards and requirements.

Importance of Quality Control in Engineering Projects

Quality control in engineering projects ensures that the outcomes meet the project’s requirements and stakeholder expectations. QC helps to:

  1. Maintain Standards: Ensures that the engineering outputs adhere to industry standards, codes, and regulations.
  2. Enhance Efficiency: Identifies defects early, reducing rework and associated costs.
  3. Ensure Safety: Prevents failures that could lead to safety hazards.
  4. Boost Client Satisfaction: Delivers projects that meet or exceed client expectations, thereby enhancing reputation and trust.

Key Components of Quality Control

  1. Inspection: Regular checks and assessments to ensure components and processes meet the specified standards.
  2. Testing: Conducting various tests to validate the integrity, functionality, and safety of materials and systems.
  3. Documentation: Keeping detailed records of processes, inspections, and test results.
  4. Audits: Independent reviews of the QC processes to ensure compliance and effectiveness.

Implementing Quality Control: A Step-by-Step Approach

Step 1: Define Quality Standards and Objectives

Example: In a bridge construction project, quality standards might include specific load-bearing capacities, material specifications, and adherence to local construction codes.

Solution: Establish clear, measurable quality objectives aligned with these standards. Develop a quality plan outlining how these objectives will be achieved.

Step 2: Develop a Quality Control Plan

Example: A manufacturing plant might need a QC plan that includes regular inspections of machinery and products, testing of material samples, and calibration of equipment.

Solution: The QC plan should detail inspection and testing schedules, criteria for quality acceptance, and procedures for addressing non-conformance.

Step 3: Train and Engage the Team

Example: On an aerospace project, engineers and technicians must be trained on the QC protocols, including how to conduct inspections and document findings.

Solution: Provide comprehensive training sessions and resources. Engage the team by fostering a quality-centric culture where every member understands their role in QC.

Step 4: Perform Regular Inspections and Testing

Example: In a software engineering project, this could involve code reviews, automated testing, and user acceptance testing.

Solution: Implement routine checks at various project stages. Use tools like checklists and testing software to ensure consistency and thoroughness.

Step 5: Record and Analyze Data

Example: In a civil engineering project, data from concrete strength tests should be meticulously recorded and analyzed to identify trends or deviations.

Solution: Maintain detailed records of all QC activities. Use statistical methods to analyze data, helping to pinpoint recurring issues or areas for improvement.

Step 6: Address Non-Conformities

Example: If a batch of electrical components fails the quality test in an electronics project, a root cause analysis should be conducted.

Solution: Develop a corrective action plan to address the root cause of the non-conformity. This might involve adjusting processes, retraining staff, or changing suppliers.

Step 7: Continuous Improvement

Example: In automotive engineering, feedback from QC processes might lead to design adjustments for future models.

Solution: Use QC data to drive continuous improvement. Implement regular reviews of QC processes to incorporate lessons learned and adapt to new challenges.


Practical Solutions for Common Quality Control Challenges

Challenge 1: Inconsistent Inspection Results

Example: In a construction project, different inspectors might have varying interpretations of the standards, leading to inconsistent results.

Solution: Standardize the inspection process through detailed guidelines and training. Use digital tools to support inspectors with clear criteria and automated data recording.

Challenge 2: Resistance to QC Processes

Example: In a fast-paced tech project, developers might resist QC processes, perceiving them as time-consuming and obstructive.

Solution: Integrate QC into the workflow seamlessly. Use agile practices where testing and quality checks are part of the daily routine, minimizing disruptions.

Challenge 3: Managing Large Volumes of QC Data

Example: In a pharmaceutical project, the QC process generates massive amounts of data from various tests and inspections.

Solution: Implement data management systems that can efficiently store, organize, and analyze QC data. Use software with built-in analytics to generate reports and insights automatically.

Challenge 4: Rapidly Changing Project Requirements

Example: In IT projects, client requirements often change, affecting the QC criteria and objectives.

Solution: Maintain flexibility in the QC plan. Regularly review and update QC processes to align with evolving project requirements. Adopt iterative testing and feedback loops to stay responsive.


Case Study: Quality Control in a Renewable Energy Project

Scenario: A solar farm installation project aimed to meet stringent quality and performance standards to secure funding and regulatory approval.

QC Implementation:

  • Defining Standards: The team outlined specific performance metrics for solar panels, including efficiency, durability, and resistance to environmental factors.
  • QC Plan: Included regular inspections of installation processes, testing of panel outputs, and audits of supplier quality.
  • Training: Workers received training on proper installation techniques and use of testing equipment.
  • Inspections and Testing: Conducted at various stages, from receiving materials to the final installation.
  • Data Recording: Comprehensive logs were kept for all inspections and tests, enabling trend analysis and performance tracking.
  • Continuous Improvement: Feedback from QC activities led to process optimizations and better supplier selection.

Outcome: The project met all quality standards, passed regulatory inspections, and achieved high efficiency, resulting in increased client satisfaction and additional funding.

Quality control is a critical component of engineering project management that ensures project success, safety, and client satisfaction. By implementing a systematic QC process—from defining standards to continuous improvement—engineering projects can achieve their objectives efficiently and effectively. Practical solutions to common QC challenges further enhance the robustness of these processes. Professional engineers must prioritize QC in every project phase to uphold the integrity and excellence of their work.

Let us know if there is anything we can do to help you prepare for the exam.


Quality Control

Architectural Engineering PE Exam Resources
NCEES
Contact Us

Copyright©  All Rights Reserved

EngineeringDesignResources.com prohibits the use or reproduction of this material by any means, graphic, electronic, or mechanical, except in the case of brief quotations embodied in critical articles and reviews. This includes photocopying, recording, taping, or by any information storage retrieval system.

Due to the dynamic nature of the Internet, web addresses or links in these materials may have changed.

Any resemblance in the images in this material to actual people or locations is merely coincidental. EngineeringDesignResources.com prohibits reprinting, copying, changing, reproducing, publishing, uploading, posting, transmitting, or using in any other manner images in this material.

Legal Issues

Project Management and Construction Administration – Legal Issues

Legal Issues Pertaining to Engineers

(c)American Spirit Images www.fotosearch.com

ARCHITECTURAL ENGINEERING PE EXAM SPECIFICATIONS

Legal Issues Pertaining to Engineers: Understanding Contracts, Liability, and Professional Responsibility

Legal issues pertaining to engineers and understanding the legal landscape is as crucial as mastering technical skills. Engineers often navigate complex projects that involve various legal considerations, from contracts to liability for errors.


Contracts: The Foundation of Engineering Projects

Contracts are fundamental in engineering projects, outlining the responsibilities, scope, and expectations of all parties involved. A well-drafted contract minimizes misunderstandings and provides a legal framework to resolve disputes.

Key Elements of Engineering Contracts:

  1. Scope of Work: Clearly define the services to be provided. Ambiguities can lead to scope creep, disputes, and additional costs.
  2. Deliverables: Specify the project’s output, including design documents, reports, or prototypes.
  3. Timeline: Set realistic deadlines and milestones to track progress.
  4. Payment Terms: Outline the payment structure, including fees, expenses, and payment schedules.
  5. Dispute Resolution: Include mechanisms such as mediation or arbitration to handle conflicts without resorting to litigation.
  6. Liability and Indemnity: Define the extent of liability and protection against third-party claims.

Example: An engineering firm was contracted to design a new bridge. The contract lacked a detailed scope of work, leading to disputes over additional tasks requested by the client. The firm incurred extra costs, and the relationship with the client deteriorated.

Solution: To prevent such issues, engineers should ensure that contracts are comprehensive and reviewed by legal professionals. Regularly updating the contract to reflect changes in scope or project requirements is also crucial.


Liability and Negligence: The Risks of Engineering Decisions

Engineers’ decisions can significantly impact public safety and welfare. Legal liability arises when errors or omissions lead to property damage, personal injury, or financial loss. Engineers can be held liable for negligence if they fail to exercise the standard of care expected in their profession.

Negligence Elements:

  1. Duty of Care: Engineers must adhere to professional standards and practices.
  2. Breach of Duty: Failure to meet these standards constitutes a breach.
  3. Causation: The breach must directly cause harm.
  4. Damages: The harm must result in quantifiable losses.

Example: An engineer designed a faulty drainage system that led to severe flooding. Investigations revealed that the engineer did not follow standard procedures. The engineer was sued for negligence and faced substantial financial penalties.

Solution: Engineers should adhere to industry standards and continually update their knowledge. Engaging in peer reviews, maintaining thorough documentation, and obtaining professional liability insurance are essential practices to mitigate risks.


Errors and Omissions: Unintended Consequences

Even the most meticulous engineers can make errors. Errors and omissions (E&O) insurance protects professionals against claims arising from mistakes or oversight in their work.

Key Aspects of E&O Insurance:

  1. Coverage: Protects against claims of professional negligence, errors, or omissions.
  2. Defense Costs: Covers legal defense expenses.
  3. Settlement Costs: Pays for settlements or judgments against the insured.
  4. Exclusions: Some policies exclude certain types of claims, such as fraud or intentional misconduct.

Example: An engineer mistakenly specified the wrong material for a building’s foundation, leading to structural issues. The client sued for damages. The engineer’s E&O insurance covered the legal fees and the settlement amount.

Solution: Engineers should carry adequate E&O insurance tailored to their practice area. Regularly reviewing the policy to ensure comprehensive coverage and understanding the terms and exclusions is crucial.


Ethical and Professional Responsibilities

Beyond legal obligations, engineers have ethical responsibilities to society, clients, and the profession. Ethical lapses can lead to legal consequences and damage an engineer’s reputation.

Code of Ethics:

  1. Public Welfare: Engineers must prioritize public safety, health, and welfare.
  2. Integrity: Maintain honesty and transparency in all professional dealings.
  3. Competence: Undertake tasks only within their areas of expertise.
  4. Confidentiality: Protect sensitive client information.

Example: An engineer discovered that a client’s project could compromise public safety. Reporting the issue led to the project being redesigned, averting potential harm.

Solution: Adhering to a professional code of ethics and participating in continuous professional development reinforces ethical practices. Engineers should also establish a clear communication channel for raising ethical concerns within their organizations.


Case Studies: Lessons Learned

Case Study 1: The Hyatt Regency Walkway Collapse (1981)

The collapse of the Hyatt Regency walkway in Kansas City resulted in 114 deaths and over 200 injuries. The disaster was attributed to a change in the design of the walkway’s support system without proper analysis. Engineers were found negligent for failing to review the modified design adequately.

Lessons Learned:
  • Engineers must rigorously review and approve design changes.
  • Effective communication and thorough documentation are vital.
  • Professional accountability and adherence to safety standards are non-negotiable.

Case Study 2: The Tacoma Narrows Bridge Collapse (1940)

Known as “Galloping Gertie,” the Tacoma Narrows Bridge collapsed due to aeroelastic flutter, a phenomenon not well understood at the time. The collapse underscored the importance of incorporating wind tunnel testing and dynamic analysis in bridge design.

Lessons Learned:
  • Engineers must continuously learn and apply new knowledge.
  • Incorporating advanced testing methods enhances design robustness.
  • Collaborative efforts with experts in other fields can improve project outcomes.

Practical Solutions and Best Practices

1. Continuous Education: Stay updated with the latest industry standards, technologies, and legal requirements. Regular training and professional development are essential.

2. Risk Management: Implement robust risk management practices, including regular project reviews, quality control, and contingency planning.

3. Legal Counsel: Engage legal professionals to review contracts, provide legal advice, and handle disputes.

4. Insurance: Maintain adequate insurance coverage, including general liability, E&O, and workers’ compensation.

5. Documentation: Keep comprehensive records of all project-related communications, decisions, and design changes. Documentation serves as evidence in legal disputes.

6. Professional Conduct: Adhere to ethical standards and maintain professional integrity in all dealings.

Conclusion

Navigating the legal landscape is an integral part of the engineering profession. By understanding and addressing contractual obligations, liability risks, and ethical responsibilities, engineers can protect their careers and contribute positively to society. Implementing best practices and learning from past cases further enhances an engineer’s ability to manage legal challenges effectively. As the profession evolves, staying informed and proactive in legal matters will remain a cornerstone of engineering excellence.

Let us know if there is anything we can do to help you prepare for the exam.


Legal Issues Pertaining to Engineers

Architectural Engineering PE Exam Resources
NCEES
Contact Us

Copyright©  All Rights Reserved

EngineeringDesignResources.com prohibits the use or reproduction of this material by any means, graphic, electronic, or mechanical, except in the case of brief quotations embodied in critical articles and reviews. This includes photocopying, recording, taping, or by any information storage retrieval system.

Due to the dynamic nature of the Internet, web addresses or links in these materials may have changed.

Any resemblance in the images in this material to actual people or locations is merely coincidental. EngineeringDesignResources.com prohibits reprinting, copying, changing, reproducing, publishing, uploading, posting, transmitting, or using in any other manner images in this material.